For my Eagle project, I built a 40 feet
retaining wall to antagonize erosion, leveled 3 outdoor steps to serve
as a safer mode of travel, added mulch to the trail around the newly
built retaining wall to level the trail, and cleaned out 2 planter boxes
to allow new seeds to be planted in them. I used pressure treated
douglas fir to build the retaining wall. The project was carried out on
November 7, 2021.
 |
 |
clearing area |
making holes for retaining wall |
Scouts from Troop 449 volunteered to help me complete the
project. Winston, Joshua, Justin, Raymond, and Arjun were the scouts
that helped me out.
.
 |
 |
pouring
cement in posts |