For my Eagle project, I built a 40 feet retaining wall to antagonize erosion, leveled 3 outdoor steps to serve as a safer mode of travel, added mulch to the trail around the newly built retaining wall to level the trail, and cleaned out 2 planter boxes to allow new seeds to be planted in them. I used pressure treated douglas fir to build the retaining wall. The project was carried out on November 7, 2021.


   clearing area making holes for retaining wall

Scouts from Troop 449 volunteered to help me complete the project. Winston, Joshua, Justin, Raymond, and Arjun were the scouts that helped me out.
         .