Building a Trail
below Inactive Fault Trail
by
Brian Hsu
Troop 468, Fremont
|
|
The
objective of this project was to build a brand new trail that will be
adjacent to the Eastern part of the lake. The trail was 53ft long and 7
ft wide. In order to create the trail, trees were cut down by adults.
The area was then cleaned up as well as removing unnecessary stumps and
rots The goal of the project was to create a trail that will allow
students to have more room to work close to the lake. It also allows
people to gain access to an area that was previously covered by dense
trees.
|
|
clearing and cutting
trees
|
moving branches |
I
would like to thank the scouts, friends, adults, and families who have
made my project possible. I also would like to thank Dr. Blueford for
allowing me to perform a project at Tule Ponds.
|
|
before |
after |
|