Building a Trail below Inactive Fault Trail
by
Brian Hsu
Troop 468, Fremont

The objective of this project was to build a brand new trail that will be adjacent to the Eastern part of the lake. The trail was 53ft long and 7 ft wide. In order to create the trail, trees were cut down by adults.  The area was then cleaned up as well as removing unnecessary stumps and rots The goal of the project was to create a trail that will allow students to have more room to work close to the lake. It also allows people to gain access to an area that was previously covered by dense trees.

clearing and cutting trees

moving branches

I would like to thank the scouts, friends, adults, and families who have made my project possible. I also would like to thank Dr. Blueford for allowing me to perform a project at Tule Ponds.