					Retaining wall near 
					Pond C with gravel by
 Jerry Qin
 Troop 111, Fremont
 |  |  My project consisted of 
		building a retaining wall at the base of a small incline and filling in 
		a depression where the large puddle of water is. The retaining wall was 
		made to prevent the composting soil from sliding down the hill when it 
		rains and the depression was filled with pea gravel. Pea gravel would 
		the soil down to prevent erosion when it rains.  My project took two workdays, spaced a week apart from one another, and 
		took place during August. Several of my friends helped out at my eagle 
		project so we could finish on time. The following is a list of helpers: 
		Robert Lin, James Dang, Wenhan Fang, Huy Nguyen, and Victor Dong.
 
			
				
					|  |  
					| before |    |